Lower Hill Urban Redevelopment
Infrastructure Project

ATTACHMENT 7: Infrastructure Design, Reports and Investigations

7.1 Line and Grade Submission by Michael Baker Jr., Inc., January 24, 2013

7.2A Design Field View Submission by Michael Baker Jr., Inc., July 25, 2014

7.2B Design Field View Narrative by Michael Baker Jr., Inc., April 2014

7.3 Pre-Final Geotechnical Engineering Report by Michael Baker Jr., Inc., December 2012

7.4 Sewage Facilities Planning Module by Cosmos Technologies, Inc., July 16, 2013

7.5 Phase I Environmental Site Assessment by Michael Baker Jr., Inc., February 2013

7.6 Lower Hill Phase I-II Archaeological Report by Michael Baker Jr., Inc. with PHMC Acceptance Letter, July 3, 2013

7.7 Environmental Document by Michael Baker Jr., Inc., October 2013

7.8 Approved PennDOT Scoping Field View Meeting Minutes for Interior and Exterior Roadways, March 31, 2014

7.9 NEPA Status Letter and Schedule of the Interior Roadway and Exterior Roadway by Michael Baker Jr. Inc., April 15, 2014

7.10 FHWA Approval of Portion of Interior Roads as Urban Collectors, July 3, 2013

7.11 Amendment to the 2013-2016 Transportation Improvement Program for Southwestern PA and the 2040 Transportation and Development Plan for Southwestern PA for the Lower Hill District Street Grid Project

7.12 City Council Consideration of Location of Streets, August 5, 2013

7.13 "Section 8: Transit and Pedestrian Improvements," Preliminary Land Development Plan (pages 37-52 and pages 91-96) by Urban Design Associates, LaQuatra Bonci Associates, and Trans Associates Engineering Consultants, Inc., April 8, 2014 (Draft)

7.14 "Cap Open Space," Preliminary Land Development Plan (page 78) by Urban Design Associates, LaQuatra Bonci Associates, and Trans Associates Engineering Consultants, Inc., April 8, 2014 (Draft)

7.15 URA Letter Allowing SEA Site Control to Conduct Improvements, April 25, 2014

 

 

Back To Lower Hill TIGER Home Page